Address

Uppal,Hyderabad,India

OSP Construction

Telecommunications Construction (OSP)

Our team has 15 years of experience and expertise in Cooper & OFC Construction & Splicing Works that involves:

Under Ground

  • Trenching in different surfaces like Gravel, Asphalt and Cement Concrete.
  • Duct laying in the trench as per given specification.
  • Manual cable pulling & cable blowing done in the ducts laid in the trench.
  • Installation of Handholes, Manholes & Splice Chamber as per construction spec.
  • Hands-on experience in performing HDD.
  • Involved in multiple back bone works for interstate connectivity.
  • Involved in multiple small cell connectivity sites.
  • Preparation & Modification of as-build as per site conditions.

Aerial

  • Pole installations.
  • Pole to Pole aerial cable installation.

In-Building

  • Cable pulling done at major MNC’s with all precautions and requirements.
  • Installation of cable trays to pull the communication cable.
  • Installation of specified racks for fiber termination.

Splicing

  • Experts in splicing single fiber cable(Fujikura 50S & 60S) & ribbon fiber cable (Fujikura 70R) cable of multiple types and sizes.
  • Experts in splicing Copper cable of multiple types and sizes.
  • Copper cable MDF installation works.
  • Fiber cable splicing & terminations done in installed racks.
  • Fiber cable terminations done at cell sites in existing & new racks.
  • Fiber cable splicing done for ring formation within the city & back bone.
  • Experts in performing Midspan splicing.

Fiber Cable Testing & Rectification

  • Experts in splicing single fiber cable(Fujikura 50S & 60S) & ribbon fiber cable (Fujikura 70R) cable of multiple types and sizes.
  • Fiber cable testing done using OTDR and submission of reports for every site.
  • Fiber rectification done to reduce dB loss and to get efficient output.
  • Handover the rectified links to the Operation & Maintenance team.
  • Experts in handling OSP & O&M activities with dedicated teams.